Jeep Parts Wiki | Ford Parts Wiki


Home | Search | Browse | Marketplace | Messages | FAQ | Guest
Corvette Assembly Manual January 1978
PrevPrevious Page - Corvette Assembly Manual January 1978Corvette Assembly Manual January 1978
WATER TEST SPECIFICATIONS A UUM VEHICLES SHOULD BE ASSEMBLED SEALED IN SUCH A MANNER A2 TO WITHSTAND A WNDSHIELD COVEHING SSATIONARY WATER PRAY TEST IN ACCORDANCE WHH THE F L w ENGWEERING WAM A I 1 I E E Sk 5S b TESI SPECIFICATIONS WITHOUT EVIDENCE MENT PANEL OF LEAKAGE TEST WILL BE PERFORMED BEFORE SEAT CUSHIONS DOOR TRIM PADS DOOR COVERAGE CARPET COWL TRHVI PANELS ARE INSTALLED W S SIDE FRAME TO DR POST FRAME Ez WITH COWL VENTILATOR IN CLOSED POSITION COMPLETE PERIMETER OF DR OPENING I 2gDER THAT LEAK SOURCES MAY BE PLUS ALL HOLES COVER PLATES ON DR R ILY OBSERVED MINIMUM TIME INNER PANEL WI I I I SPECIAL EMPHASIS AT ALLOWANCE FOR SPRAY WILL BE FOUR 4 TO MANOMETER THE BOTTOM OF THE DR INNER PANEL MINUTES ALL NOZZLES WILL BE FULL CONE TO BLOWER SILL PLATE AREA SPRAY WITH 60 INCLUDED ANGLE SPRAYING SYSTEMS CO FULL JET SPRAY NOZZLES NO T 1 V2 GG 25 OR EQUIVALENT 3 30 GAL PER MIN I UNDERBODY DASH ROCKER PANEL COVER WATER new PRESSURE AT NOZZLE wm ms 18 P S I FOR DISTANCE FROM BODY ANGLE E7 ALL JOINTS HOLES COVER PLATES ON OF NOZZLES SEE DIAGRAM FOR NOZZLE J DASH 8 RR COMPT PANEL TO U B JOINT LOCATIONS DASH PANEL TO U B JOINT BODY BOLTS K I i RR COMPT AREA TO WHEELHOUSE WATER TEST 1 Mrscmmusous co VERAGE HEADER SEAL TO W S HEADER SPEEKL EMPHES EHGULD EE PLACED ON SIDE ROOF RAIL SEAL TO DR THE OBSERVATION OF ALL ATTACHMENTS RR QUARTER SEAL RR EDGE OF DR I I V f IOLDIZNGS EMBLEMS MISC PARTS RR WINDOW SEALS TO ROOF PANEL x 3 H WOULD PROTRUDE INTO THE PASSEN SPECIAL EMPHASIS SHOULD BE PLACED IN GER COMPT OR THE RR COMPT AREA THE OBSERVATION OF ALL ATTACHMENTS OF MOLDING MISC RIVETED JOINTS SUCH AS DRIP MOLDING TO ROOF RAIL SEAL COMPLETE PERIMETER OF BACK WINDOWS nvnnm nm n m M mum nm em Zh A M ggg g 78 convene y mm KZ in A 1 1 m i WATER SPRAY TES A m EC 70005 t m 2 76 LZ I C D L I